In October of 2020 we made a 1,300 mile trip up to Lake Oswego, Oregon to visit our daughter. My goal was also to build out a basement bathroom for her. I spent 6 weeks down in the basement, mostly by myself, breaking out concrete, removing the old cast iron plumbing, re-plumbing with ABS and
Our designs mostly reflected what our team wanted to fly, I must say it was a challenge keeping up with them. We produced over 30 different models, about half of them made it into production.